Included are design, technical development, project documentation, and organizational goals. The organization of this document is as follows: (1) Goals - Describes goals of the R&D and preliminary design period (2008-2011). ![]() to initiate construction of Project X in the 2012 time frame, assuming a go ahead decision in roughly 2010. The purpose of this document is to describe an R&D plan that would position the U.S. ![]() Depending upon future directions flexibility is retained for delivering neutrinos toward the DUSEL site and/or protons into the Tevatron. It is anticipated that Project X configured as described above would initially support high intensity neutrino beams to the NOvA experiment, in parallel with at least one new 8 GeV based flavor/rare decay experiment. ![]() Finally, substantial modifications to the existing NuMI target station will be required to support >2 MW operations. The Main Injector would need a new RF system, measures to preserve beam stability through transition, and measures to mitigate electron cloud effects. ![]() = injection system, a new RF system, a new extraction system, and measures to mitigate electron cloud effects, in the Recycler Ring.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |